You have heard of STEM but what is STEAM?

AMBER JOHNSON | September 23, 2019

article image
Let’s start with the basics for those of us who aren’t familiar with STEM either: STEM is an acronym for Science Technology Engineering and Mathematics, and is frequently used when referencing these academic disciplines. STEAM, however, adds an A for Arts. STEAM was championed by John Maeda, former President of Rhode Island School of Design, whose argument for the importance of the arts in education points to the need for students to be creative thinkers, innovative and use design-thinking.

Spotlight

Hyundai Engineering Co. Ltd.

HEC executed more than 200 process plant projects worldwide including Desulfurization, Polypropylene Project, South Pars Field Development 2&3, 4&5, HPC Complex Phase I & II and HDO #2 HOU Project

OTHER ARTICLES
CONSTRUCTION

3 Ways Design Will Change Post-COVID

Article | June 16, 2021

The global pandemic has affected fundamental aspects of everyone’s daily lives, from the way we work and learn to how we shop and socialize. The need for social distancing has brought about a number of changes to the public spaces used by all, such as one-way systems and temporary hand-sanitizing facilities. However, these measures are short-term fixes, often shoehorned into spaces that were not designed with social distancing in mind. The challenge for architects and designers as we move into a post-COVID future is to design for these new requirements in innovative and creative ways that still enable a sense of togetherness while maintaining physical distance – the new post-COVID architecture. These are three ways architecture might change as a result of the pandemic.

Read More
ENGINEERING TECH

IoT and BIM for automatic performance recording

Article | May 14, 2021

As part of a Digipro project, ALLPLAN is working with three partners to research a system for automatic performance measurement using IoT and BIM. DigiPro focuses on the digitalisation of products, processes and business models in companies. As part of the German-Dutch INTERREG program Digipro, a project is currently underway that aims to automate performance recording on the construction site using IoT (Internet of Things) and BIM (Building Information Modelling). A consortium of four companies - BuildersMind, mangineers, Nijhuis Bouw B.V. and ALLPLAN - is working on a solution for automated construction site monitoring that documents construction progress in near real time. Promising results have already been achieved in an alpha test phase on two construction sites of Nijhuis Bouw in Enschede 2020.

Read More
ENGINEERING TECH

Lake Zug East: Switzerland's Longest Construction Site Completed

Article | July 30, 2021

ntil recently, the infrastructure measures at Lake Zug East were the longest construction site in Switzerland. The 15-kilometer-long project has since been successfully completed after 20 months of construction. Not only has the full closure – which was necessary for economic and environmental protection reasons – been lifted, but one of the important access routes to the Gotthard Tunnel has also been completed. The fact that this could be done without any problems and delivered on schedule despite Coronavirus is due to the work of Emch+Berger WSB AG. The engineering firm was commissioned by the Swiss Federal Railways (SBB) to undertake the planning, overall project management, and construction management. The planning was based on a BIM model in Allplan Engineering.

Read More
CONSTRUCTION

Infrastructure Policy Watch: impact of Covid-19 behaviour change and Australian Budget boost

Article | May 18, 2021

The National Infrastructure Commission (NIC) has published a new assessment of how behaviour change brought by Covid-19 will impact infrastructure networks as part of its prep work ahead of the second National Infrastructure Assessment. The NIC’s findings are that it's too early to assume that Covid-19 behaviour change will lead to completely different patterns of infrastructure use, even if these changes remain in place. The commission recommends using realistic scenarios and planning responses to the range of possibilities these scenarios present to manage uncertainty. They also suggest a more ‘adaptive’ approach to longer-term project commitments and using data to understand how changes are unfolding.

Read More

Spotlight

Hyundai Engineering Co. Ltd.

HEC executed more than 200 process plant projects worldwide including Desulfurization, Polypropylene Project, South Pars Field Development 2&3, 4&5, HPC Complex Phase I & II and HDO #2 HOU Project

Events