CONSTRUCTION

Creating a custom Thermal Asset for a Revit Material - early energy modeling with Insight

| May 20, 2021

article image
When using the Autodesk Revit + Insight workflow for early architectural energy modeling, and using the Detailed Items option which uses the Thermal Assets associated with each Revit material, it is often necessary to create a custom asset for a specific product.

Spotlight

CDM Smith

CDM Smith provides lasting and integrated solutions in water, environment, transportation, energy and facilities to public and private clients worldwide. As a full-service engineering and construction firm, we deliver exceptional client service, quality results and enduring value across the entire project life cycle.

OTHER ARTICLES

Infrastructure Policy Watch: new resilience guidelines from Australia and UK hydrogen strategy

Article | August 24, 2021

Infrastructure Australia outlines new guidance on how to improve infrastructure resilience Infrastructure Australia has released a new set of resilience guidelines for infrastructure, noting that the events of recent years have brought Australia’s vulnerability to threats such as bushfires, droughts, floods, pandemics and cyber-attacks into sharp focus. The Advisory Papers, developed in partnership with Infrastructure New South Wales, estimate that, by 2050, the economic cost of natural disasters in Australia will more than double from about AU$18 billion annually to AU$39 billion. Infrastructure Australia wants infrastructure resilience in project planning and business cases “to become business as usual”. The organisation is required to evaluate business cases for infrastructure projects that receive more than AU$250 million in funding from the federal government and has indicated it may reject proposals that do not effectively incorporate infrastructure resilience.

Read More

Infrastructure Policy Watch: impact of Covid-19 behaviour change and Australian Budget boost

Article | May 18, 2021

The National Infrastructure Commission (NIC) has published a new assessment of how behaviour change brought by Covid-19 will impact infrastructure networks as part of its prep work ahead of the second National Infrastructure Assessment. The NIC’s findings are that it's too early to assume that Covid-19 behaviour change will lead to completely different patterns of infrastructure use, even if these changes remain in place. The commission recommends using realistic scenarios and planning responses to the range of possibilities these scenarios present to manage uncertainty. They also suggest a more ‘adaptive’ approach to longer-term project commitments and using data to understand how changes are unfolding.

Read More

Nurturing female ambassadors in STEM from a young age

Article | March 9, 2020

It’s widely recognised that the global STEM sector has struggled to recruit more women into science, tech, engineering and mathematical careers. In line with this, female student enrolment globally, for STEM-related subjects at degree level is particularly low with only 5% of women choosing natural science, mathematics and statistics. The gender gap is still wide open and schools need to be doing all they can today to enhance the educational experience of young females across the country.

Read More

The Risks, Barriers and Opportunities of BIM

Article | May 5, 2021

Building Information Modeling (BIM) is revolutionizing the architecture, engineering, and construction (AEC) industry worldwide. For many public sector and major projects, BIM has become the required method of working. Yet, despite the increasing acceptance and use of BIM, there are still some barriers to its adoption.

Read More

Spotlight

CDM Smith

CDM Smith provides lasting and integrated solutions in water, environment, transportation, energy and facilities to public and private clients worldwide. As a full-service engineering and construction firm, we deliver exceptional client service, quality results and enduring value across the entire project life cycle.

Events